In May of 2021, Cryoport Systems began expanding its operations in Houston, Texas. With the business growing exponentially, the company needed additional space to help with its temperature-controlled global supply chain solutions for the life sciences market.

Over four months, Brandt performed the mechanical, electrical, and plumbing installations in the 21,000-square-foot facility. Approaching the project with a holistic approach enabled our crews to work toward their goal of achieving the highest-quality installations.

Mechanical

Brandt installed the rooftop units, split systems, VRF systems, associated piping, and HVAC ductwork. Our mechanical team had the opportunity to demonstrate Brandt’s efficient, top-notch installation methods within a narrow time frame.

Electrical

During the construction phase, our electrical team provided temporary power and lighting to the building to enable all trades to work more efficiently. Furthermore, our high-focus electrical scope included:

  • 625 KVA Diesel Generator with a NEMA 3R sound attenuation enclosure and transfer switch
  • Complete power distribution and branch circuiting system
  • Complete lighting package with controls and inverter
  • All emergency and exit lighting

Plumbing

Our specialized plumbing team provided comprehensive new-build plumbing, including connections and pipe runs for all sanitary, domestic water, and condensate lines. Installations included:

  • Restroom fixtures
  • Service sinks
  • Scullery sink
  • Breakroom sink
  • Mop sink
  • Hose stations
  • Emergency eyewash and shower
  • Water heaters

PROJECT TEAM

Owner: Cryoport Systems

Contractor: The Austin Company

PROJECT DETAILS

Start/Completion Dates: 05/2021 – 09/2021

Project Size: 20,805 SF

Brandt Role: Mechanical, Electrical & Plumbing Services