HOUSTON METHODIST WALTER TOWER-BROWN DUNN RENOVATION

HOUSTON, TEXAS

Hunt Construction awarded Brandt the Mechanical and Plumbing for this multi-phase renovation and build back of the Brown and Dunn building Levels 2 and 3 where the New Walter Tower will tie in.

Brandt’s Scope of Work includes patient rooms, laboratory, pre-op, PACU, OR, pharmacy and staff spaces. In addition, we performed the following services:
• Plumbing demo and installation of medical gas, sanitary waste and vent, and domestic water on Level 3.
• Piping demo and installation of the HHW and CHW water system and installing over 30 VAVs on Level 3.
• Sheet Metal demo and installation. This includes the demo of 10 separate AHU on Level 5 as well as all the ductwork on level 3.

PROJECT TEAM

Owner: Houston Methodist Hospital System
Architect: WHR Architects
Engineer: Affiliated Engineers, Inc.
Contractor: Hunt Construction

PROJECT DETAILS

Project Size: 23,582
Start/Completion Dates: 10/2018 – 12/2019
Brandt Role: Mechanical and Plumbing Services