SAMSUNG LEGACY HQ
PLANO, TEXAS
Brandt was hired by SpawGlass to serve as the mechanical subcontractor. Our team worked closely with SpawGlass and Samsung, which allowed us to meet the owner’s needs and energy/code requirements within the established budget.
Samsung Legacy houses offices, private offices, R&D labs, network labs, restrooms, locker rooms, and breakrooms.
From start to finish, the six-month timeline required constant communication between the general contractor and our team. We also took into consideration the product availability for our material specifications.
The mechanical scope included a complete build-back of HVAC/plumbing systems. This project included supplemental DX Liebert units, terminal units, air devices, ductwork, refrigerant piping, plumbing fixtures and domestic plumbing including underground and above groundwork.
PROJECT TEAM
Owner: Samsung
Contractor: SpawGlass
Architect: HLW Steve Fonseca
PROJECT TEAM
Project Size: 2,0000
Start/Completion Dates: 08/2018 – 02/2019
Brandt Role: Mechanical Design-Assist